Facility Evaluation Report
Licensing Program Analyst (LPA) conducted an announced Case Management visit. LPA disclosed the purpose the visit to Administrator Dawnne Melton and was allowed entry into the facility.
The facility requested a change of capacity from 4 (four) ambulatory clients to (6) clients. Two (2) clients that are currently residing at Marsell’s Adult Residential Facility #2 will be moving to this facility. The facility requested a fire inspection. The Fire Clearance Inspection Report (STD850) was completed by the local fire authority and received in the San Diego Regional Office (SDRO) on June 17, 2026. The requested fire clearance has been approved by the local fire marshal, which includes the facility's new floor plan.
LPA reviewed the facility’s new floor plan, which matches the STD 850. LPA also conducted a brief tour of the facility. The Change of Capacity request will be forwarded to the SDRO management team for approval.
No deficiencies were observed or cited during today's annual inspection.
An exit interview was conducted with Dawnne, to whom a copy of this report, and the Licensee/Appeal Rights (LIC9058 03/22) were provided during the visit.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction