Facility Evaluation Report
On 10/2/2025 at 9:15AM, Licensing Program Analyst (LPA) G. Luk arrived unannounced to conduct a Required - 1 Year inspection. LPA met with Licensee, Brenda Huynh and Administrator, Roderick Tabion. LPA explained the purpose of the visit. The facility’s fire clearance was approved for 4 ambulatory and 2 non-ambulatory clients.
LPA toured the facility including but not limited to bedrooms, bathrooms, dining area, kitchen, shed, garage, and outdoor area. Smoke and carbon monoxide detectors were observed. Fire extinguisher was observed to be full and last serviced on 2/3/2025. One week of nonperishable and 2-day of perishable food supplies were available. Hot water temperature was measured at 105 degrees F in the hallway bathroom. There were adequate lights in each room. First Aid kit is complete. Last fire drill was conducted on 8/31/2025.
LPA reviewed 3 clients and 3 staff files starting at 9:40AM. All staff are fingerprint cleared and associated to the facility. LPA reviewed client's P&I logs and observed no discrepancies. LPA reviewed clients' medications during inspection.
At 11:00AM, LPA observed C2 has a full bed rail and was not on hospice care. Full bed rail was removed during inspection.
The deficiency was observed (see LIC 809D) and cited from the California Code of Regulations, Title 22 and Health & Safety Code. Failure to correct deficiency may result in civil penalties. Exit interview conducted. A copy of this report and appeal rights was provided.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction