Facility Evaluation Report
On 12/30/2025 at 10:00AM, Licensing Program Analyst (LPA) G. Luk arrived unannounced to conduct a health and safety check of residents. LPA met with Administrator, Roselyn Chand and informed her the reason for visit.
LPA toured facility including but not limited to the bedrooms, bathrooms, common area, kitchen, outdoor area, and separate buildings. Hot water temperature was measured at 114.3 degrees F in a hallway bathroom sink. 7-day of non-perishable and 2-day of perishable food supplies were sufficient. Administrator will be putting another order for food supplies this week.
Facility has 7 staff currently for AM shift including: Administrator, 2 caregivers, 1 maintenance staff, 1 house keeper, and 2 kitchen staff.
LPA requested a copy of the staff schedule (12/30/2025 to 1/5/2026) to be sent to CCLD by 12/31/2025.
No deficiencies are being cited on this date.
Exit interview conducted with Roselyn Chand. A copy of this report was provided.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction