Facility Evaluation Report
On 02/13/2025 at 10:00 AM , Licensing Program Analysts (LPAs) P. Manalo and L. Fontanilla came to the facility unannounced to conduct pre licensing inspection. LPAs waited for the Licensee/ Applicant to arrive, but was not available. LPAs left to do another visit, and came back at 12:30 PM. LPAs met with Licensee/Applicant, Linmei Chiao and Assistant Program Director, Amanda Hsu,
and explained the purpose of the visit. The facility has an approved fire clearance for a capacity of twenty (20) ambulatory.
LPAs toured facility including but not limited to the lobby, kitchen, storage room, community room, and two bathrooms. LPAs observed lighting in all rooms. Smoke detectors are interconnected. Carbon monoxide detector was observed in operating condition. First aid kit was complete. Emergency disaster plan was complete. Fire extinguisher was observed to be full and last served on 8/13/2024.
The following will need to be completed before recommending licensure to Centralized Application Bureau (CAB):
1. Hot water was measured at 128.6 degrees Fahrenheit in the hallway bathroom sink.
This facility is not yet licensed, and is subject to final approval by CAB. Additional requirements may still be required.
Exit interview conducted and a copy of this report was provided to Licensee/applicant.