Facility Evaluation Report
On 07/02/2024 at 1:52 PM, Licensing Program Analyst (LPA) Ardalan Gharachorloo arrived unannounced to conduct 1-Year Annual Inspection. LPA met with Administrator Mesalina Lee Gonzales and explained the purpose of the visit.
LPA toured the facility including but not limited to bedrooms, bathrooms, kitchen,common area and backyard. All indoor and outdoor passageways are kept free of obstruction comfortable temperature for clients is maintained at 72 degree F. LPA observed lighting in all rooms are adequate for comfort and safety of the clients. Hot water temperature in the bathroom was measured at 118 degree F. All toilets, hand washing, and bathing are safe, sanitary and in operating condition. The supply of extra hygiene was available for clients. There is a minimum of one week supply of non-perishables and 2-day perishables food supply.
Smoke detectors and carbon monoxide were in operating condition during visit. Fire extinguisher was last serviced on 12/20/2023. Emergency disaster plan was last posted on 07/28/2020. Fire drill was last conducted on 06/04/2024.
At 2:35 PM, LPA reviewed 4 clients' records. At 2:50 PM, LPA reviewed 5 staff records. All staff and client files were complete. at 2:10 PM, All clients medications were reviewed.
No deficiencies were cited during the visit. Exit interview conducted and a copy of this report provided.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction