Facility Evaluation Report
LPA Kelly Nguyen attempted to conduct an unannounced 1 year annual requirment visit. LPA arrived at the home to find no one present. LPA contact Administrator (AD) LEE-GONZALES, MESALINA G. and explained the purpose of the visit. AD stated that there's no one a the facility because all staff have to assist clients to MITC East Bay Day Program, and AD have to meet with the RECB behavioral case manager, in house CM, and Client mother.
On 11/13/2023 at 12 PM, Licensing Program Analyst (LPA) K. Nguyen arrived unannounced to a conduct 1-Year Annual Required inspection. LPA met with Lee-Gonzales, Mesalina Administrator and explained the purpose of the visit.
LPA toured facility with Mesalina including but not limited to bedrooms, bathrooms, kitchen, common area and backyard. The facility consists of 4 total bedrooms which 3 bedrooms are occupied by the clients and 1 bedroom is occupied by staff. All outdoor and indoor passageways are kept free of obstruction. There are no bodies of water observed. A comfortable temperature is maintained at 71 degrees Fahrenheit. LPA observed lighting in all rooms are adequate for the comfort and safety of the residents. The hot water temperature in the residents’ shared bathroom was measured at 112 degrees Fahrenheit. Clients’ bathrooms are equipped with grab bars and non-skid mats. There is a minimum of one week supply of nonperishable and 2-day of perishable foods. Centrally stored medication and sharps were locked and inaccessible to Clients.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction