Facility Evaluation Report
01/21/2025 01:30 PM Licensing Program Analyst (LPA) Rebecca Knight made an unannounced visit to the facility and met with administrator Esperanza Chavez. The purpose of this visit was conduct a plan of correction inspection.
On a prior visit LPA observed multiple large cracks in the pavement in the patio area in between the office and activities room and substantiated a physical plant deficiency.
During today’s visit LPA observed the cracks had been ground down level and filled with waterproof flex sealer to even the surface. This fulfills the plan of correction for the deficiency that was issued on 12/10/2024. LPA will issue the proof of correction letter to facility.
No deficiencies were issued as a result of today's visit. An exit interview was conducted and the report was provided to administrator Esperanza Chavez.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction