Facility Evaluation Report
Licensing Program Analyst (LPA) De Leon arrived at 2:50pm to conducted a 1 year annual visit to the facility above. LPA met with Administrator Nereida Leal and explained the purpose of the visit.
A tour of the inside and outside of the facility was conducted. The following was inspected and noted during the annual visit:
Infection Control: The facility has submitted a current Infection Control Plan to the department. The facility has a sign in and out binder for visitors at entry with hand sanitizer. The bathrooms have toilet paper, paper towels, and hand soap. The facility has EPA approved disinfectants spray and cleaners. The facility has a 30 day supply of PPE. Quarantined or isolated individuals will have meals and medication delivered to rooms. Staff are trained on infection control and the use of Personal Protective Equipment (PPE). All trash cans and waste baskets have tight fitting covers.
Physical Plant & Environmental Safety: The facility is a 4 bedroom with 1 shared resident bathroom, and 2 common area bathrooms currently occupying 6 residents and employs 6 staff with 1 being Administrator. The facility is clean, safe and sanitary. LPA was authorized to enter and inspect facility. The facility has smoke alarms and a carbon monoxide detector. The lighting and lamps are sufficient for the use of the facility and for residents comfort. The facility kitchen is clean, safe and sanitary. Toilet, hand washing and bathing facilities are operational. The pathways are clear of any obstructions. Facility is well lit inside and outside for safety. Disinfectant, cleaning solutions and poisons are inaccessible to residents in care locked under kitchen sink and in garage. The facility has sufficient space inside and outside for activities and visiting. The facility has a backyard and front yard at 4:00pm LPA did not find any out door furniture or umbrella for resident use. The facility has telephone and internet service for resident use. Water temperatures were tested and within regulation requirements, bathroom #1 measured at 109.8 F.
Operational Requirements: The facility has a current plan of operation with the department. The Facility is operating in compliance with the granted fire clearance. The facility is approved for a capacity 6 with 6 being Non-Ambulatory. Continued 809-C
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction