Facility Evaluation Report
Licensing Program Analyst (LPA) Fred Arias made an unannounced visit for the purpose of conducting a Plan of Corrections Inspection for deficiencies issued on 05/23/2025 during the required annual inspection. LPA was greeted and granted entry by staff and discussed the purpose of the inspection. LPA toured the facility to check if the deficiency had been corrected with staff. LPA reviewed documents obtained.
LPA reviewed Type A deficiency CCR 87305(a) and at this time, the Licensee Tin Le has not obtained a building permit for the room built into the garage, thus not correcting the deficiency by the Plan of Correction (POC) due date of 5/24/2025. However, the Licensee has begun the process of applying for a building permit as of 06/08/2025. Licensee sent LPA screenshot of the building permit application with the City of Huntington Beach to demolish the room in the garage.
Based on LPA's observation and record review on today's visit, the Plan of Corrections have not been fully completed by the POC due date.
An exit interview was conducted with staff and a copy of this report was provided to the facility representative.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction