Facility Evaluation Report
Licensing Program Analyst (LPA) Fred Arias conducted an unannounced visit to verify facility closure, and to ensure no clients were receiving care and supervision at the facility. LPA was greeted by Licensee Angelita David. Licensee informed LPA that last client's day on site was on June 30, 2025.
On today's date, LPA conducted a tour of the physical plant. LPA observed no signs of residents or the facility in operation. Licensee stated she has converted the facility into her private residence.
LPA requested the facility license as it is part of the closure process, and the license was surrendered during the visit. LPA informed the licensee of the licensing procedure for future facility operation if desired.
Licensee has decided to permanently close the facility at this time. The Department will proceed with the closure as of June 29, 2026.
An exit interview was conducted with staff representative and a copy of the report was provided at the end of the visit.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction