Facility Evaluation Report
Licensing Program Analyst (LPA) Angela Barutyan arrived at the facility unannounced to conduct a second Case Management - Annual Continuation visit at 10:47AM continuing the inspection that began on 06/13/2025 and was continued on 08/05/2025. LPA met with Director of Nursing (DN) Jessica Saks and Executive Director (ED) Allison Marty. Entrance interview conducted.
Beginning at 12:07PM, the LPA, along with ED Marty, DN Saks, Director of Plant Operations (DPO) Miguel Castenada, and Los Angeles County Public Health Environmental Health Specialist Edgar Antonyan toured the physical plant areas inside and outside to ensure there are no health and safety hazards and that facility is in compliance with Title 22 Regulations. The following was observed:
FACILITY LAYOUT: The facility has three (3) buildings, which are named Building A, Building B, and Building C. The facility has three hundred thirty-six (336) units. Building B has a Memory Care Unit on the seventh (7th ) floor and there are three (3) delayed egress doors on the seventh floor. At 03:37PM, LPA tested one (1) delayed egress door and staff responded promptly. Buildings A and C are primarily for independent living, while Building B is for assisted living, mezzanine living, and memory care.
KITCHEN: At 12:28PM, the LPA observed the kitchen to have a sufficient supply of perishable and non-perishable food at the time of the visit. Appliances in the kitchen were clean and appeared functional. Snacks and beverages are available for residents in the Bistro. Food is prepared in the main kitchen, which is located in Building A on the second floor and is delivered to the separate dining rooms. Emergency water supply is stored in locked storage rooms on every floor.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction