Facility Evaluation Report
Licensing Program Analyst (LPA Jose Tan met with Administrator Marine Karapetian for a One (1) Year Required visit for this facility. LPA explained the reason for the visit.
A tour of the physical plant was conducted at 9:44 AM and the following was noted:
There is only one entrance being utilized at the facility, the front main entrance door. Screening area is located immediately upon entrance. There is also a sign in sheet, hand sanitizer, gloves and masks available. The facility had submitted and approved Mitigation and Infection plan.
The facility is a single storey building with shared and private bedrooms and bathrooms. Exit signal alarms were tested and at 10:05 AM and observed to be operational. All indoor and outdoor passageways/exits were free of obstruction. There is no body of water in the facility. The facility maintains a comfortable temperature at 75°F. The facility's smoke alarms are hard wired and interconnected and back up tests are done in house on a regular basis.
The facility is equipped with sprinkler system which was last tested on 02/09/24 and valid until 01/31/27. Fire extinguishers are located all throughout the facility and were last serviced on 02/05/25. Fire Drill was last conducted on 08/05/25..
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction