Facility Evaluation Report
Licensing Program Analyst (LPA) Michael Cava conducted an Annual Required visit and inspection of the facility. LPA met with the administrator, Romeo Balasanyan, and explained the reason for the visit.
At approximately 12:00pm, LPA took a tour of the physical plant. The facility is a one story building. Required postings were observed in the entry area. The smoke alarms and carbon monoxide are dual and interconnected. There is one fire extinguishers located in the kitchen. It was purchased on June 21, 2025
Kitchen: The kitchen appliances and fixtures were functional. LPA found a sufficient amount of perishable and non-perishable food properly stored. Knives were stored in a locked drawer in the kitchen. Cleaning supplies were stored locked underneath the kitchen sink.
Bedrooms: There are three (3) bedrooms designated for residents' use. All three bedrooms are shared. Bedrooms were observed to be properly furnished with appropriate beddings and linens with sufficient lighting.
Bathrooms: There are two (2) bathrooms designated for residents' use. Both bathrooms were properly supplied and had functional fixtures, grab bars and non-skid mats. Hot water temperature was measured between 109 and 114 degrees Fahrenheit. No cleaning supplies were observed in either bathrooms during the day of the inspection.