Facility Evaluation Report
On 5/22/2026, Licensing Program Analyst (LPA) Perchui Milena Khurshudyan arrived at this facility to conduct a required Annual Inspection. Upon arrival LPA introduced herself by showing her department badge, was greeted by the Chief Executive Officer (CEO) Charles Arrieta and the Assistant Administrator (AA) Rolando Ongkiko. LPA explained the reason for the visit and requested staff and residents’ rosters for review.
LPA Khurshudyan reviewed the required postings on a wall and used the inspection tool to complete today's visit. The YES sign, Ombudsman information, Personal Rights, Disaster Plan, Master Menu, and Activity schedules are displayed along the hallway leading to the first-floor dining area.
A tour of the physical plant was conducted at around 10:50am and the following was noted:
The facility is fire cleared for one hundred forty-six (146) Non-ambulatory residents. The facility also has a hospice waiver for three (3) residents. The facility is currently occupying eighty-one (81) residents.
There is one main entrance being utilized at the facility. The facility is two-story building and has one (1) elevator. During the visit, LPA checked the elevator and observed it was operating properly.
The facility has a total of seventy-three (73) beds, of which forty-three are on the second floor and thirty (30) on the first floor. The facility has private and shared rooms for residents.
LPA observed several common bathrooms throughout the facility, all bathrooms appeared clean and were functional. Bathrooms had signs, grab bars and paper towels. The staff and resident bathrooms are not shared. Adjacent to the laundry room accessible from the facility is a shower area available for residents who cannot shower independently or require a larger space, such as those who use wheelchairs.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction