Senior Care Records.

Facility Evaluation Report

Heart To Heart Senior Living, Northridge01/29/2024Licence 197610171

Capacity6
Census5
Date signed01/29/2024 12:32:58 PM
The inspector’s account

On 01/29/24 at 09:55 AM, Licensing Program Analyst (LPA) Gina Saucedo, arrived to conduct an unannounced, annual inspection at the facility. Upon arrival, LPA Saucedo met with Caregiver-Armine Hayrapetyan and disclosed the purpose of the visit. The Administrator-Veronika Yebeyan was called and arrived at 10:26 AM.

LPA asked for the census, resident, and staff rosters.

A physical tour was conducted at 11:10 AM and observed the following:

The Kitchen area was toured, and LPA observed there to be sufficient seven (7) day supply of non-perishable foods and perishable food for all residents. The kitchen area was clean at the time of the tour. The fire extinguisher is located against the wall on your left-hand side, next to the sink. It is fully charged with dated 10/2023. There is a telephone line on one of the counters in the kitchen. There is extra, food emergency kits in the kitchen and in the kitchen pantry. The sharps are locked and inaccessible to the residents in one of the upper cabinets. The medication is also locked and inaccessible to the residents in one of the upper cabinets closer to where the table is located.

Outside/Backyard: The outside/backyard has furniture for residents with proper seating. The facility has a signal system. The facility has a pool that is fenced and locked that inaccessible to residents.

Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction