Facility Evaluation Report
On 06/04/2025 at 1:30 p.m., Licensing Program Analyst (LPA) Evelin Rios arrived at the facility listed above to conduct an unannounced annual inspection using the Inspection Tool. LPA rang the door bell and was greeted by staff #1 (S1) who granted access. S1 contacted the administrator, Ann Liza Calderon-Macias. Administrator met LPA shortly after and LPA explained the reason for the visit.
At approximately 1:47 p.m., with the assistance of the administrator and S1, LPA conducted a physical plant tour. LPA observed appropriate postings by the entry and on the hallway to the clients bedrooms.
Kitchen: The kitchen appliances and fixtures were functional. LPA observed a sufficient amount of 7-day non-perishable and a 2-day perishable supply of food at the facility, properly stored. The fire extinguisher is located in the kitchen and was purchased on 10/03/24.
Bedrooms: There are five (05) bedrooms available for clients, with one designated as a shared bedroom. Each bedroom is well-furnished, with appropriate bedding, sufficient lighting, and storage
Bathrooms: There are three (3) bathrooms designated for clients. All bathrooms were properly supplied and had functional fixtures. Hot water temperature was measured at 105 degrees Fahrenheit. Bathrooms are supplied with hand soap, toilet paper and paper towels but clients have the option to use a bidet and hand dryer.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction