Facility Evaluation Report
Licensing Program Analysts (LPA) Jose Villalobos conducted an unannounced Required- 1 year visit using the full Care Compliance and Regulatory Enforcement (CARE) Tools. The purpose of the visit was explained to Administrator Mariciel Gamboa. The following 12 (CARE) tool domains were utilized during the inspection:
Infection control practices and Personal Protective Equipment (PPEs) were observed. COVID-19 screening is no longer in place. Infection Control Plan observed.
A current Plan of Operation observed. Dementia Care Plan Observed
A fire clearance for 6 residents of which (6) may be non ambulatory
Hospice care waiver approved for up to four (4) resident.
The facility is a single-story house includes: living room, dining area, attached garage/storage, front and backyard, kitchen, pantry, TV room, three (3) resident bedrooms, two (2) bathrooms and a staff room
The interior and exterior physical plant was inspected. Exit doors are free of any obstruction and there are no pools or large bodies of water. Cleaning supplies and toxic substances are inaccessible.
Water temperature readings measured within the required 105 - 120 degrees Fahrenheit.
Staff have criminal background clearance and training.
Four (4) staff files were reviewed. Required training observed
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction