Facility Evaluation Report
On 10/30/2025 at 1:30 PM, Licensing Program Analyst (LPA) L. Alexander arrived unannounced to conduct 1-Year Annual Required inspection. LPA met with Administrator, Denise Mansfield and explained the purpose of the visit. The facility’s fire clearance was approved for three (3) non-ambulatory and one (1) may be bedridden.
LPA toured the facility including but not limited to bedrooms, bathrooms, kitchen, common area and backyard. The facility consists of 3 total bedrooms which 3 bedrooms are occupied by the clients. All outdoor and indoor passageways are kept free of obstruction. There are no bodies of water. A comfortable temperature for clients is maintained at 71 degree Fahrenheit. LPA observed lighting in all rooms are adequate for the comfort and safety of the clients. Hot water temperature in the shared clients’ bathroom was measured at 116.0 degree Fahrenheit. All toilets, hand washing and bathing are safe, sanitary and in operating condition. The supply of extra hygiene supplies were available for clients. There is a minimum of one week supply of nonperishables and 2-day perishables food supply.
Smoke detectors and carbon monoxide were in operating condition during visit. Fire extinguisher was last serviced on 06/09/2025. Emergency Disaster Drill was last posted on 11/2024. First aid kit was observed to be complete. Fire drill was last conducted on 10/08/2025
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction