Facility Evaluation Report
On 11/13/2023 at 9:50 AM, Licensing Program Analyst (LPA) P. Watson arrived unannounced to conduct Required 1 Year Annual inspection. LPA met with Administrator, Desiree Hufalar and explained the purpose of the visit. The facility’s fire clearance was approved for 5 Non-Ambulatory of which 5 may be Bedridden.
LPA toured the facility including but not limited to bedrooms, bathrooms, kitchen, common area and backyard. The facility consists of 5 total bedrooms which all 5 bedrooms are occupied by the clients. All outdoor and indoor passageways are kept free of obstruction. There are no bodies of water. A comfortable temperature for clients is maintained at 71 degree Fahrenheit. LPA observed lighting in all rooms are adequate for the comfort and safety of the clients. Hot water temperature in the shared clients’ bathroom was measured at 114.4 degree Fahrenheit. All toilets, hand washing stations, and bathing stations are safe, sanitary and in operating condition. LPA observed a supply of extra hygiene items for clients. There is a minimum of 7 day supply of non-perishables and 2 day perishables food supply.
Smoke detectors and carbon monoxide were in operating condition during visit. Fire extinguisher was last serviced on 02/22/2023. Emergency Disaster Drill (earthquake) was last conducted on 09/12/2023. Fire drill was last conducted on 10/19/2023. First aid kit was observed to be complete.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction