Facility Evaluation Report
On 06/25/21 at 11:15 AM, Licensing Program Analyst (LPA) Daisy Panlilio conducted an infection control annual inspection and explained the purpose of the visit with administrator. Facility has a completed mitigation plan in place dated 03/01/21 to mitigate the spread of COVID-19. LPA discussed the completed mitigation plan (LIC 808) and COVID-19 infection control practices with administrator.
LPA inspected the facility inside and outside. LPA observed a screening station located near the front entrance with visitor's log, hand sanitizer, face masks, no touch temperature probe. Routine symptom screening (+/-) temperature and symptom check) is done at entry for all staff, residents and visitors.
LPA observed COVID-19 signages posted in common areas to promote hand washing, cough/sneeze etiquette and physical distancing. Facility documents daily temperatures and COVID-19 symptom checks for staff and residents. Pathways were observed to be free of obstruction and fire hazards. A written emergency/disaster plan was observed last updated on 01/22/2020.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction