Facility Evaluation Report

Cadence Millbrae, Millbrae07/08/2026Licence 415601039

Capacity165
Census134
Date signed07/08/2026 02:23:49 PM
Name of licensing program analystJaime Vado
Name of licensing program managerApril Cowan
The inspector’s account

On 07/08/2026, Licensing Program Analyst (LPA) Jaime Vado conducted an unannounced annual inspection visit. LPA met with the executive director Holly Suiter and explained the purpose of today's visit. There are currently 110 residents in assisted living and 24 in memory care.

This is a multi-level facility approved for all residents allowed to be non-ambulatory, five bedridden, and a hospice clearance for 14 residents. This facility does have a secured memory care area. There are currently 8 residents on hospice at this time. The physical plant was toured inside and outside of the facility to ensure the safety of the clients. LPA observed the facility kitchen which is clean and observed appliances are in good repair. Knives are stored and locked and secured in the kitchen. Perishable and non-perishable food supplies are observed as in place. Kitchen grade fire extinguisher is observed as in place and with an inspection date of 07/02/2026. First aid kit is observed as complete with required items as observed in medication room and through out the facility. Medications are observed to be locked in cabinets and medication cart in the medication room in assisted living and in a medication cart in memory care. LPA reviewed resident medications at random and observed them as current. LPA observed that there are multiple fire extinguishers in place on each floor with an inspection date of 06/29/2026 smoke detector, carbon monoxide detectors are observed in place through out the facility, and central heating and air conditioning. Last emergency/disaster drill was conducted on 06/25/2026 regarding power outages and procedures with such cases.

Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction