Facility Evaluation Report
On this day, March 6, 2025, at 3:25 pm, Licensing Program Analyst (LPA) Delmundo arrived unannounced to conduct an annual required inspection and met with staff, Jina Sunien and Alvin Luyon, and informed the reason for visit. LPA called and spoke over the phone with Regina Luyon, administrator (ADM) who gave permission to Alvin Luyon to be with LPA during inspection. ADM arrived after about 30 minutes.
LPA toured the facility inside out with Alvin Luyon. LPA inspected the living room, dining area, kitchen, bathroom, residents room, front, side and backyard. Food supplies were checked and observed good for 2 days of perishables and 7 days of non-perishables. Central storage for medications and cabinets for cleaning supplies and sharps were observed locked.
Facility has smoke and carbon monoxide detectors that were tested and observed in operating condition.Hot water temperature in the bathroom was tested and measured at 109.5 degrees Fahrenheit. Facility conducts disaster drills at least quarterly with fire and earthquake drills last conducted 1/03/25. Fire extinguisher checked, observed fully charge with receipt showed purchased on 10/15/24.
LPA reviewed 5 staff and 4 residents files. Medications checked, and compared with LIC622 Centrally Stored Medication and Destruction Records and doctor's orders. Residents' P&I checked and compared with last recorded balance.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction