Facility Evaluation Report
On 11/07/2022 at 12:00 PM, Licensing Program Analyst (LPA) Jose Calderon conducted an unannounced annual inspection visit at the Cameron Home Facility. LPA Calderon was allowed entry into the facility by Administrator Ronnell Agliam. Administrator Agliam asked infection control questions and took LPA Calderon temperature prior to entrance into the facility. The facility is licensed for three (3) adult clients with developmental disabilities. Currently, there are (3) residents residing in the facility with developmental disabilities.
LPA Calderon explained to Administrator Ronnell Agliam, the purpose of the one-year Annual Inspection visit, and escorted LPA Calderon on a tour of the entire inside and outside facility grounds. As part of the inspection, LPA Calderon reviewed: (3) resident service records, (3) resident medication records, (3) staff records, and inspected the inside facility and outside grounds. The facilities’ last fire drill was conducted on 09/22/2022 . The one-story residential home consists of (3) resident bedrooms, (3) resident bathrooms, living room, dining room, family room, kitchen, office area, attached garage with washer and dryer/ storage area, backyard with table and chairs. No weapons are stored in the premises. Kitchen was inspected and observed to be clean and operational. A two-day supply perishable and seven-day supply of non-perishable foods are present in the facility. Emergency Water supply is found in the garage
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction