Facility Evaluation Report
On 04/27/2022 at 8:15AM, Licensing Program Analyst (LPA) James Sampair conducted an infection control annual inspection. LPA explained the purpose of the visit with S1 upon entry, who then called the administrator who arrived at 9:30AM.
Facility has a mitigation plan (LIC 808) in place dated 07/09/2021 to mitigate the spread of COVID-19. LPA discussed the importance of having an updated infection control plan in accordance with PIN 22-13-ASC .
LPA inspected the facility inside and outside. LPA observed the 2 staff assisting 6 of the 6 clients with activities of daily living. One central entry point has been designated for universal entry screening with the station located near the front entrance with visitor's log, hand sanitizer, face masks, and no touch temperature probe. COVID-19 signs were posted throughout the facility to promote hand washing, cough/sneeze etiquette and physical distancing.
A written Emergency/Disaster plan was posted on the bulletin board for staff, clients and visitors to read. Centrally stored medications were locked in the cabinets. Sharp objects were locked underneath the kitchen sink. Toxic chemicals were stored in a locked closet inside the garage. Infection control designated leader is the administrator.
Source: California Department of Social Services, Community Care Licensing. Methodology · Report a correction